Home > Airports > Airport Runway PH.1 & Taxiway/Apron PH.2, Salisbury, MD

Airport Runway PH.1 & Taxiway/Apron PH.2, Salisbury, MD

Download PDF of this Project

Salisbury, MDairport runway phase 1

Owner
Wicomico Regional Airport

Project Type
Airport Infrastructure

Sargent Corporation’s Role
General Contractor

Architect
Delta Airport Consultants
9711 Farrar Court, Suite 100
Richmond, VA 23236
(804) 275-8301

Start/Finish
8/05—11/06

Description/Significance

Reconstruction of the airport’s general aviation apron and taxiway involved minimal excavation, but crews had to contend with a high groundwater table and marginal soils.

Reconstruction of Runway 14-32 required 200,000 yards of excavation and narrowed the existing runway from 150 feet wide to 100 feet wide. A new storm drain system needed to be installed to replace the old one that was failing.