Reconstruct Runway, Frenchville, ME
Frenchville, ME
Owner
Northern Aroostook Regional Airport Authority
Project Type
Airport Reconstruction
Sargent Corporation’s Role
General Contractor
Engineer
Stantec
141 Portland Street
Boston, MA 02114
(617) 523-8103
Start/Finish
July-Sept. 2008
Description/Significance
This project consisted of reclaiming existing runway surface, adding supplemental aggregates, grading, and paving.
Project also included construction of two storm water retention ponds, and grading, loaming, and seeding of safety areas and runway perimeter.
Project was on a very tight schedule, as the runway was the only one at the airport.