Water Main Installation, Port Clyde, ME
Port Clyde, Maine
Owner
Port Clyde Water District
Project Type
Water Main Installation
Sargent Corporation’s Role
General Contractor
Engineer
Dirigo Engineering
2 Dirigo Drive
Fairfield, ME 04937
(207) 453-2401
Start/Finish
April-Oct. 2006
Description/Significance
Replacement of a primitive, seasonal water system with a full-time year-round service to all houses in the community.
Installation of 1,500 feet piping for the main line, and 5,200 feet of piping along side streets ad residential services.
Reclaiming and repaving roadways after installing water lines.
Also included drainage piping, widening of some streets, and new curbing and sidewalk.

Download PDF of this Project