Water Main Installation, Eastport, ME

Download PDF of this Project

Eastport, Mainewater main eastport

Owner
Passamaquoddy Water District

Project Type

Water Main Installation

Sargent Corporation’s Role
General Contractor

Architect
A.E. Hodsdon
10 Common Street
Waterville, ME 04901
(207) 873-5164

Start/Finish
April-Sept. 2006

Description/Significance
Replacement of 2 miles of water main.

Installation of 9,700 feet of 12” pipe and 1,700 feet of 8”” pipe.

Installation of temporary water services while the existing water main was replaced.